Works Undertaken

  1. Factory cleared of redundant equipment, fixtures and fittings. Offices cleared of all redundant furnishings, fixtures and fittings.
  2. Extensive enabling works for asbestos removal.
  3. Non notifiable asbestos removal – 4500 square metres asbestos cement double layered roofing materials, 2700 square metres thermoplastic floor tiles.
  4. Major notifiable licensed asbestos removal work including strip out of 2500 square metres of AIB ceilings in offices.
  5. Demolition of all structures and disposal from site of all arising materials excluding hardcore. Hardcore stockpiled.
  6. Concrete floor slabs and building foundations – No current requirement to excavate below ground level.